We have 4 of our own Mobile Concrete Batching Plants that can be set up close to the project to avoid delays with concrete supplies. Concrete can be delivered to the paver from P J Davidson's on site batching plant, 24/7 if requied. Our two medium sized plants are each capable of producing 700 m3 of concrete per shift; Our two larger plants are each capable of producing over 1,000 m3 of concrete per shift.

PJD Batching Plants #1 & #4 have recently produced 230,000 m3 of concrete in Aberdeen